Project Details

    Client: Devon Energy

    Completion Date: July 2013

    Industry Sector: Oil & Gas

    Area of Expertise: Horizontal Directional Drilling

    Services Provided

    • Construction Site Selection and Surface Evaluation
    • Subsurface Investigation and Evaluation
    • Project Risk Analysis and Decision Making Support
    • Front End and Detailed Design
    • Contingency/ERP Design
    • Contracting Strategy Evaluation and Contractor Qualification
    • Construction Monitoring, Trouble Shooting  and Contingency/ERP Implementation
    • Project Completion Summary and Project Archive

    Client Challenge

    Crossing of the Beaver River with an NPS 4 pipeline.

    Entec’s Solution

    Entec provided route evaluation and geotechnical review leading to a change in the crossing location to avoid unsuitable geology. Detailed design was then completed with a high level of confidence in feasibility. Providing contract preparation, tendering and construction support allowed Entec to provide timely decision making support.

    Results & Client Benefit

    Although a short 232-m drill path, construction proved challenging and Entec was able to assist in providing a cost effective solution for the client.