Project Details

    Client: TransCanada Pipelines

    Completion Date: April 2009

    Industry Sector: Conventional Oil & Gas

    Area of Expertise: Horizontal Directional Drilling

    Services Provided

    • Construction Site Selection and Surface Evaluation
    • Subsurface Investigation and Evaluation
    • Project Risk Analysis and Decision Making Support
    • Front End and Detailed Design
    • Contingency/ERP Design
    • Contracting Strategy Evaluation and Contractor Qualification
    • Construction Monitoring, Trouble Shooting  and Contingency/ERP Implementation
    • Project Completion Summary and Project Archive

    Client Challenge

    Crossing of the Peace River with a 42” natural gas pipeline

    Entec’s Solution

    Entec provided route evaluation, geotechnical review, feasibility analysis, detailed design, contract preparation, tendering and construction support. Deep casing designs allowed for installation of a crossing that would otherwise be unfeasible. Skilled construction support allowed for enforcement of engineering specifications.

    Results & Client Benefit

    1100-m drill path required the installation of 90-m of 84” surface casing through difficult geology that could not be overcome through the HDD process alone. The client received a well designed and constructed product as a result of diligent engineering and construction support.